5m Smart Bridge (2022)
Autodesk Research | Dar Al-Handasah
A collaboration with Dar to explore fully automated design and manufacture of civil infrastructure. I led the project team from beginning to end, including on: generative design for dual load cases (cantilever during print, propped after installation), angled large-format robotic 3D printing in recycled glass-filled PETG, and material characterisation including interlayer temperature testing to validate structural performance. Sensors embedded during printing enable real-time structural health monitoring.